Comparison

Autodesk Takeoff vs Procore

On the evidence we track, Procore leads this comparison with a composite score of 77/100. Scores are only directly comparable because these tools share a category; the full breakdown and every source is below.

Machine formatsJSONMarkdownGraphQLor send Accept: application/json
Autodesk Takeoff43
Procore77
Score
Vioscale score
Autodesk Takeoff43 / 100low · 26%updating
Procore77 / 100low · 46%updating
Pricing
Free tier
Autodesk Takeoff
Procore
Model
Autodesk Takeofffree
Procorequote
Price level
Autodesk Takeofffree
Procoreunknown
Transparent
Autodesk Takeoff
Procore
Integrations
Count
Autodesk Takeoff1
Procore500
Security
Disclosure policy
Autodesk Takeoff
Procore
Fedramp
Autodesk Takeoff
Procore
Gdpr
Autodesk Takeoff
Procore
Iso27001
Autodesk Takeoff
Procore
Soc2
Autodesk Takeoff
Procore
Reliability
Sla pct
Autodesk Takeoff
Procore99.9
Status page
Autodesk Takeoff
Procore
Market
Availability
Autodesk Takeoff

Features

The capabilities each product documents. These tools do not share a category taxonomy, so this aligns what each vendor states rather than a normalised feature set.

Declared feature comparison
FeatureAutodesk TakeoffProcore
Accounting erp-
Aia g702 g703 progress billing-
Automated addenda and revision notifications-
Bim ifc-none
Certified payroll davis bacon reporting-
Change order revenue impact budgeting-
Deployment model-cloud_web_app
Digital plan room document distribution-
Direct integration to construction erp project management-
Diversity and inclusion mwbe tracking-
Document control-
Equipment depreciation and usage cost allocation-
Estimating takeoff-
Granular phase and cost code budget tracking-
Historical subcontractor performance scoring-
Iso 19650-
Iso 27001-
Mass itb invitation to bid email blasting-
Mobile support-mobile
Pricing model-acv_volume
Primary module-suite
Public open project lead bulletin boards-
Purchase order and subcontract management-
Retainage withholding tracking-
Rfi submittal-
Safety quality-
Scheduling-
Side by side bid leveling comparison-
Soc2-
Soc2 type ii-
Subcontractor prequalification and compliance-
Target segment-gc
Union payroll complex fringe deductions-
Wip work in progress over under billing reporting-

What each one is

The product in its own terms, so the numbers below have context.

Autodesk Takeoff

Extract precise quantities and measurements directly from 3D construction models online, streamlining the takeoff and estimating process for construction teams and estimators.

Independently observed

Procore

Leader

End-to-end construction project management platform that manages projects from preconstruction to closeout with AI-powered agents, real-time collaboration, and integrated cost and resource management.

Independently observed

Pricing

List pricing as published by each vendor, with the date we read it. Always verify at the source before you buy.

Autodesk Takeoff

FreeFree tier30-day trial

30-day free trial available; post-trial pricing not documented in provided text

as of verify ↗

Procore

Leader
Quote-based

Custom ACV-based pricing with unlimited users, data, and support. Field Productivity available with FTE-based pricing.

  • Custom (ACV-based)Contact sales
    • Unlimited users across all stakeholders
    • Unlimited data storage for documents and files
    • Unlimited 24/7 technical support
    • Product enhancements at no additional cost
    • 18 on-demand role-based certifications
    • +2 more
as of verify ↗

Platform & deployment

Where each product runs and how it can be hosted. A dash means undocumented, not unsupported.

Platforms
Web
Autodesk Takeoff
Procore
Deployment
Cloud / SaaS
Autodesk Takeoff
Procore

Integrations

What each product connects to. Counts come from the vendor's own integration directory where one exists.

Autodesk Takeoff

1 total
  • BuildingConnected
Independently observed

Procore

Leader
4 total
  • Databricks
  • Power BI
  • DocuSign
  • Power BI Desktop
Independently observed

Comparison generated from independently-sourced facts. Every value links to its source and retrieval date. See the method.